Week 3: Continued Site Model

This week my group continued with building the site model. We finished making the permanent parts of the Dadley building (the parts of the building we wont be designing into). Having these parts of the building site model gives our own individual design models more context when we go to present.

The first image (below left) shows the part of the building that is glued to the site model base. This is kept here so that you will be able to see our individual designs in the site model but it will also give it context.

The seond image (below right) shows the removable top level of the Dadley building. This is removable so that it doesn’t block our designs when presenting.

The last image (below center) includes the floors above the basement. This is removable so that it can be placed on top to see the building as a whole as well as so the interior of our designs can be seen.

Leave a comment